Warning: mkdir(): No such file or directory in /home/1202897.cloudwaysapps.com/kjzfqaeyez/public_html/wp-content/mu-plugins/endurance-page-cache.php on line 1454
Arab Potash Company – Jordan – Controware

Controware | Electrical Solutions

 

Arab Potash Company – Jordan

Arab Potash Company
APC – Safi Plant Upgrade:

The project consist of two parts:

  1. Virtualization platform upgrade:

Where the project scope was the following:
Upgrade from ESXi 5.5 to ESXi 6.0.

  • Upgrade of the two host ESXi servers.
  • Upgrade of SAN storage Firmware.
APC – Aqaba Plant Upgrade:

The project consist of:

Upgrade of 800xA system from 5.1 to 6.1 where the system consisted of :

  • Redundant Aspect Servers.
  • Redundant Connectivity servers.
  • Redundant Domain servers.
  • 3 operator.
  • 9 AC800M Redundant Controllers (PM866)
APC – Tripper Car Upgrade:

The project consist of:

Upgrade of old Control Cabinet of Siemens PLC into ABB PLC and Siemens Drive:

  • AC800M Controller (PM851).
  • Profibus communication with Siemens variable speed drive.
APC – Marshalling Extension:

The project consist of:

Adding new cabinets to the existing system with the same configuration

Year:
2020
Client:
APC - Jordan
Category:
Cement & Mining
Back To Top