APC – Safi Plant Upgrade:
The project consist of two parts:
- Virtualization platform upgrade:
Where the project scope was the following:
Upgrade from ESXi 5.5 to ESXi 6.0.
- Upgrade of the two host ESXi servers.
- Upgrade of SAN storage Firmware.
APC – Aqaba Plant Upgrade:
The project consist of:
Upgrade of 800xA system from 5.1 to 6.1 where the system consisted of :
- Redundant Aspect Servers.
- Redundant Connectivity servers.
- Redundant Domain servers.
- 3 operator.
- 9 AC800M Redundant Controllers (PM866)
APC – Tripper Car Upgrade:
The project consist of:
Upgrade of old Control Cabinet of Siemens PLC into ABB PLC and Siemens Drive:
- AC800M Controller (PM851).
- Profibus communication with Siemens variable speed drive.
APC – Marshalling Extension:
The project consist of:
Adding new cabinets to the existing system with the same configuration